House Flip Story: Gateway Blvd – Update 2

This update has been a long time coming. As I was walking through the house this morning, on what should be the final week of this rehab project, I was reminded that I haven’t really done an update lately on my little red-headed stepchild. So here it is, our retail house flip in District Heights.

We got a little off track with this rehab project. I learned that I will NEVER do a flip again without pulling permits, and that I will always use trusted sub-contractors, especially when using a new general contractor. My contractor for this job has dealt with some pretty heavy setbacks, in terms of, horrible subs, very angry inspectors (who actually shut us down), and a steep learning curve for pulling building permits. Heck -- even God took it out on the poor guy, with two massive blizzards!

Through thick and even more thick, my guy has hung in there and he’s bringing this job home. Check it out our progress video below:

Popularity: 4% [?]

Share and Enjoy:
  • email
  • Facebook
  • TwitThis
  • Google Bookmarks
  • del.icio.us
  • Ping.fm
  • StumbleUpon
  • Digg
  • Technorati
  • Sphinn
  • Matt

    I'm not sure if I ever replied to you because I'm having some issues with Disqus. Thanks for your comments. I use a crappy Panasonic camera for my videos than import them to my sweet MacBook Pro where I then of course use iMovie.
  • Nice Video Craig. The house looks like it is coming along great!!

    Is that Windows Movie Maker you are using??
blog comments powered by Disqus